Zvenigorodskaya
Recent coverage
- Efimov: Architectural finishing is underway at three stations of the Rublevskaya-Arkhangelskaya metro line — Вечерняя Москва
- Efimov: Over 750,000 cubic meters of soil excavated on the Rublevo-Arhangelskaya line section — Вечерняя Москва
- Sobyanin Conducts Technical Launch of Rublevo-Arkhangelskaya Line Metro Section — Коммерсантъ
- Moscow's Tram Schedule Temporarily Changed — НТВ Москва