China Launches 7th Reactor Block at Tianwan NPP
China has started the seventh reactor block of the Tianwan Nuclear Power Plant, according to Rosatom's press service.
Consensus
- The seventh reactor block of the Tianwan Nuclear Power Plant in China has been launched.
- The reactor has achieved a self-sustaining, controlled nuclear chain reaction.
- Russian state corporation Rosatom participated in the construction of the plant.
- The project is considered the largest economic cooperation project between Russia and China in the field of nuclear energy.
- The reactor has been brought to a minimal controlled power level.
- Testing will follow, with gradual power increase before grid connection.
Points of divergence
- The construction of the seventh and eighth blocks of the Tianwan NPP began in May 2021. — kommersant
- Rosatom's CEO Alexey Likhachev described the cooperation with Chinese specialists as smooth and effective. — kommersant
- The first phase of the station (blocks 1 and 2), built by Russian specialists, has been in commercial operation since 2007. — kommersant
- The Tianwan Nuclear Power Plant is located in Tianwan, Liangyun District, Lianyungang City, Jiangsu Province, on the Yellow Sea coast. — vesti
Coverage (2 sources)
- In China, the Tianwan Nuclear Power Plant's seventh block reactor has been started — Коммерсантъ
- In China launched the seventh power block of Tianwan Nuclear Power Plant, built with Russia — Вести