Meanwhile, Alexey Alexandrov, head of the civil construction…
Meanwhile, Alexey Alexandrov, head of the civil construction department, reminded that last year the TAO managed to build and modernize four schools with a total area of 51.5 thousand square meters, which can accommodate almost 2.7 thousand students.
Consensus
- 10 educational facilities were built or reconstructed in the Troitskoye Administrative District of Moscow between 2021 and 2025.
- The construction and reconstruction were funded by the Moscow city budget.
- The total capacity of the facilities is 6,500 places.
- The total area of the buildings is approximately 95,000 square meters.
- The projects were carried out under the City's Targeted Investment Program.
- New or renovated schools and kindergartens were established in the districts of Bekasovo, Voronovo, Krasnopakhorskoye, and Troitsk.
- In 2025, four schools were completed or modernized in the district.
- The total area of the four schools completed in 2025 was 51,500 square meters.
- The four schools completed in 2025 have a combined capacity of nearly 2,700 students.
- The school in Voronovo (No. 2073) was fully reconstructed, including replacement of engineering systems, facade and interior updates, and connection via a heated passage to a new building from 2024.
- The school in Voronovo now serves 350 students in grades 1–5.
- The school in Vatutinki, with an area of over 19,000 square meters, is ready for opening and has three main buildings with natural lighting and a capacity of 1,200 students, including IT and lab facilities and age-group separation in flow design.
Points of divergence
- The educational complex in Shchapovo includes an IT polygon, a programming classroom, a robotics class, an acrylic painting workshop, a library-information center, and a multi-functional auditorium. — riamo
- The educational complex in Shchapovo has a multi-functional auditorium, sleeping areas, a multi-functional sports and music hall, and classrooms for developmental activities in the preschool section. — m24
Coverage (2 sources)
- Efimov: 10 schools and kindergartens with a total capacity of 6,500 places were built in the TAO of Moscow over 5.5 years — РИАМО
- Schools and kindergartens with 6,500 places were built and reconstructed since 2021 in TAO — Москва 24
Key entities
- Vladimir Efimov
- Moscow
- Troitsky Administrative Okrug
- TINAo
- Complex of Urban Planning Policy and Construction
- TAO
- TAO Photo