Moscow Ready for Heating Season
Moscow is ready for the new heating season. Municipal services have carried out preventive inspections, repaired engineering systems and equipment.
Consensus
- Moscow is prepared for the upcoming heating season.
- Engineering systems and equipment have been inspected and repaired.
- 19,500 kilometers of heating networks have undergone hydraulic testing.
- 74,000 buildings were prepared for the heating season between May and August.
- Internal central heating systems were updated in more than 820 residential buildings.
- Emergency brigades have been formed and equipped for winter operations.
- 54 stationary snow-melting points have been prepared for snow disposal.
- Existing power capacities ensure stable and uninterrupted supply of energy resources to consumers, infrastructure projects, and urban development programs.
Points of divergence
- 13 thermal power plants, 38 district, and 42 quarter heat stations were prepared for the cold season. — vm
- A stress test was conducted for the heat supply system, and temperature tests of heating networks were successfully completed before the heating season. — ntv
Coverage (9 sources)
- Moscow fully ready for heating season — Новости Москвы
- Residential buildings and social facilities in Moscow are prepared for the heating season — Вечерняя Москва
- It will be warm in winter: Moscow officially ready for the heating season — Вечерняя Москва
- Moscow ready for new heating season — Город Москва
- Moscow ready for new heating season — Мэр Москвы Сергей Собянин
- Sobyanin: Moscow is ready for the new heating season — Вести
- Sobyanin: Moscow is ready for the new heating season — Вечерняя Москва
- Sobyanin: Moscow ready for new heating season — НТВ Москва
- Sobyanin: Moscow ready for new heating season — Москва 24
Key entities
More on Sergei Sobyanin
- Moscow's Migration Control Experiment Proves Successful
- Sobyanin: digital control at the border covers 53% of migration…
- Medvedev Pushes for Nationwide Migrant Biometric Monitoring