Moscow Launches Second Phase of Prefab Factory
The second batch of the factory for prefabricated structures for the rapid construction of residential buildings has been launched, Moscow Mayor Sergey Sobyanin reported.
Consensus
- The second phase of a factory for manufacturing prefabricated construction elements was launched in Moscow.
- The factory's total area has doubled.
- The proportion of factory-made components in buildings has increased from 15–20% to currently 50%.
- The goal is to increase the share of factory-made components to 70%.
- The new production system combines prefabrication and monolithic building techniques.
- The method allows for the manufacture of vertical walls, facades, sanitary modules, and engineering blocks.
- Slab flooring is poured directly on the construction site.
- Time-consuming processes such as plastering and screeding are minimized.
- High-quality factory products allow for immediate transition to finishing work.
- Installation of engineering systems is simplified and accelerated using pre-fabricated modules.
- The factory will employ 1,700 people, including workers in unique construction industry professions.
- The project aligns with the national project 'Kadry' (Human Resources).
Points of divergence
- The expert Anatoly Kolесnikov stated that this is a shift in the economic model of housing construction across an entire megacity. — vm
- The expert emphasized that one factory operator today replaces an entire team of finishers on-site. — vm
- The expert noted that the ideal factory geometry eliminates the 'human factor' at critical stages. — vm
- The expert stated that the factory is 100% supplied with domestic materials and components from Russian regions. — vm
- The expert highlighted that the factory's output drives demand for dozens of suppliers across Russia. — vm
- The factory uses materials and components from specific Russian regions, including cement from Voronezh and Novotroitsk, window profiles from Kostroma, mineral wool from Ryazan and Belgorod, ceramic tiles from Orel and Noginsk, and plumbing equipment from Cheboksary and Tver. — tg_mos_sobyanin
- The factory uses materials and components from the same specific Russian regions as mentioned in the 'tg_mos_sobyanin' source. — ntv
Coverage (4 sources)
- Expert Kolesnikov assessed the launch of the second phase of the prefabricated structures plant in Moscow — Вечерняя Москва
- Started the second phase of the factory for manufacturing prefab structures for accelerated construction of residential buildings — Мэр Москвы Сергей Собянин
- In Moscow launched the second phase of the prefabricated structures manufacturing plant — НТВ Москва
- Sobyanin: New prefabricated construction plant workshops use materials from regions — Вечерняя Москва