Transcaucasian Highway Reopens After Closure
All vehicle traffic was restricted on the Transcaucasian Highway in North Ossetia due to deteriorating weather conditions, with full closure from 19:00 on August 29, 2026, until further notice. The road reopened at 9:45 MSK on August 30 after clearing operations.
Consensus
- The Transcaucasian Highway was closed to all vehicle traffic on August 29 from 19:00 MSK.
- The closure affected the section between the village of Buron and the Northern Portal of the Rokski Tunnel.
- The closure was due to deteriorating weather conditions.
- The road reopened on August 30 at 9:45 MSK after clearing operations.
- The Transcaucasian Highway is the only road connecting South Ossetia to Russia.
- Traffic was allowed in both directions after reopening.
Points of divergence
- The closure was due to deteriorating weather conditions. — vesti
- The closure was due to the need for clearing the road surface. — interfax
- The Federal Customs Service confirmed that all transport was suspended at the international road crossing point of Nizhny Zaragam on the border with South Ossetia. — vesti
Coverage (3 sources)
- Transkam opened for all types of transport after road clearing — Интерфакс
- Trans-Cam closed for all types of transport in North Ossetia — Вести
- Transkam closed for all types of transport in North Ossetia — Интерфакс